CSI MasterFormat divisions: the full list of 50, explained with real estimates

The divisions that organize every specification and estimate, what each one covers, a quick lookup by trade, and a real sample for most of them.

By the MassBid Estimation team · Reviewed by a senior estimator with 10+ years of experience · Published · Updated

In short

CSI MasterFormat is the standard system for organizing construction specifications and cost estimates in the United States and Canada. It sorts all the work on a project into 50 numbered divisions, 00 to 49, such as 03 Concrete, 09 Finishes and 26 Electrical. Estimators use the same divisions so that an estimate lines up with the specifications and the bid form.

Published by
The Construction Specifications Institute and Construction Specifications Canada
Number of divisions
50, numbered 00 to 49, with several held in reserve
Before 2004
16 divisions
Building work
Divisions 02 to 14
Mechanical and electrical
Divisions 21 to 28
Site work
Divisions 31 to 33

What MasterFormat is for

A set of construction documents has two halves: the drawings, which show where things go, and the specifications, which say what they are made of and how they are installed. MasterFormat is the filing system for the specifications. Every product and trade has a home, identified by a six-digit number whose first two digits are the division.

Because architects, contractors, suppliers and estimators all use it, a subcontractor can open any project manual and find their work in the same place. An estimate laid out the same way can be checked against the specifications section by section.

The 2004 edition expanded the system from 16 divisions to 50, mainly to give mechanical, electrical, communications and site work more room.

The full list of CSI divisions, 00 to 49

MasterFormat has 50 division numbers, 00 to 49, in six groups. Thirty-five are in use; the rest are reserved for future expansion. The divisions most building projects use are 01 to 14, 21 to 28 and 31 to 33.

All 50 CSI MasterFormat division numbers, grouped into subgroups, with the reserved numbers marked
GroupDivision numbers and titles
Procurement and Contracting Requirements00 Procurement and Contracting Requirements
General Requirements01 General Requirements
Facility Construction02 Existing Conditions · 03 Concrete · 04 Masonry · 05 Metals · 06 Wood, Plastics and Composites · 07 Thermal and Moisture Protection · 08 Openings · 09 Finishes · 10 Specialties · 11 Equipment · 12 Furnishings · 13 Special Construction · 14 Conveying Equipment · 15 to 19 reserved
Facility Services20 reserved · 21 Fire Suppression · 22 Plumbing · 23 Heating, Ventilating and Air Conditioning (HVAC) · 24 reserved · 25 Integrated Automation · 26 Electrical · 27 Communications · 28 Electronic Safety and Security · 29 reserved
Site and Infrastructure30 reserved · 31 Earthwork · 32 Exterior Improvements · 33 Utilities · 34 Transportation · 35 Waterway and Marine Construction · 36 to 39 reserved
Process Equipment40 Process Interconnections · 41 Material Processing and Handling Equipment · 42 Process Heating, Cooling and Drying Equipment · 43 Process Gas and Liquid Handling, Purification and Storage Equipment · 44 Pollution and Waste Control Equipment · 45 Industry-Specific Manufacturing Equipment · 46 Water and Wastewater Equipment · 47 reserved · 48 Electrical Power Generation · 49 reserved
Division titles from the current MasterFormat edition, published by CSI and Construction Specifications Canada.

What each division used on a building covers:

CSI MasterFormat divisions used on most building projects and what each covers
DivisionCovers
00 Procurement and Contracting RequirementsBid forms, instructions to bidders, contract conditions
01 General RequirementsSupervision, temporary facilities, permits, cleaning, closeout
02 Existing ConditionsDemolition, site assessment, hazardous material removal
03 ConcreteFormwork, reinforcing, cast-in-place and precast concrete
04 MasonryBrick, concrete block, stone, mortar and grout
05 MetalsStructural steel, joists, deck, stairs, railings, miscellaneous metals
06 Wood, Plastics and CompositesRough framing, sheathing, trusses, finish carpentry, millwork
07 Thermal and Moisture ProtectionRoofing, insulation, waterproofing, flashing, sealants, firestopping
08 OpeningsDoors, frames, hardware, windows, storefront, curtain wall, glazing
09 FinishesDrywall, ceilings, flooring, tile, paint, wall coverings
10 SpecialtiesToilet accessories, signage, lockers, fire extinguishers
11 EquipmentKitchen, laboratory, medical and other fixed equipment
12 FurnishingsCasework, window treatments, furniture
13 Special ConstructionPools, pre-engineered structures, special rooms
14 Conveying EquipmentElevators, escalators, lifts
21 Fire SuppressionSprinklers, standpipes, fire pumps
22 PlumbingPiping, fixtures, water heaters, drains
23 HVACDuctwork, air handling, heating and cooling equipment, controls
25 Integrated AutomationBuilding automation systems
26 ElectricalPower distribution, wiring, devices, lighting
27 CommunicationsData, voice, audio-visual cabling
28 Electronic Safety and SecurityFire alarm, access control, video surveillance
31 EarthworkClearing, excavation, grading, fill, shoring
32 Exterior ImprovementsPaving, curbs, sidewalks, fencing, landscaping
33 UtilitiesWater, sewer, storm drainage, site electrical and gas

Divisions 34 and 35 cover transportation and marine construction. Divisions 40 to 48 cover process and industrial equipment, such as material handling, water and wastewater treatment and power generation. The numbers in between are held in reserve.

The old 16 CSI divisions, and where they went

Before 2004, MasterFormat had 16 divisions, numbered 1 to 16. Many older specifications, cost books and contractors' cost codes still use them. Divisions 3 to 12 and 14 kept their numbers; sitework, mechanical and electrical were split up.

The 16 CSI divisions used before 2004 and the current MasterFormat divisions that replaced them
Old division (16-division format)Current division
1 General Requirements01 General Requirements
2 Site Construction (sitework)02 Existing Conditions (demolition), 31 Earthwork, 32 Exterior Improvements, 33 Utilities
3 Concrete03 Concrete
4 Masonry04 Masonry
5 Metals05 Metals
6 Wood and Plastics06 Wood, Plastics and Composites
7 Thermal and Moisture Protection07 Thermal and Moisture Protection
8 Doors and Windows08 Openings
9 Finishes09 Finishes
10 Specialties10 Specialties
11 Equipment11 Equipment
12 Furnishings12 Furnishings
13 Special Construction13 Special Construction, with fire suppression, controls and security moved to 21, 25 and 28
14 Conveying Systems14 Conveying Equipment
15 Mechanical21 Fire Suppression, 22 Plumbing, 23 HVAC
16 Electrical26 Electrical, 27 Communications, 28 Electronic Safety and Security

Which CSI division is it? Quick lookup by trade

Mechanical work is Division 23 (HVAC), with plumbing in Division 22 and fire sprinklers in Division 21. Drywall is Division 09, section 09 29 00, and demolition is Division 02, section 02 41 00. Sitework is split across Divisions 31 Earthwork, 32 Exterior Improvements and 33 Utilities, and asphalt paving is 32 12 16. The table gives the division and the section number most specifications use for each common trade.

Which CSI MasterFormat division and section covers each common construction trade
TradeDivisionTypical section
Demolition02 Existing Conditions02 41 00 Demolition
Concrete03 Concrete03 30 00 Cast-in-Place Concrete
Precast concrete03 Concrete03 40 00 Precast Concrete
Rebar03 Concrete03 20 00 Concrete Reinforcing
Masonry (brick, block)04 Masonry04 20 00 Unit Masonry
Structural steel05 Metals05 12 00 Structural Steel Framing
Stairs, railings, miscellaneous metals05 Metals05 50 00 Metal Fabrications
Framing lumber06 Wood, Plastics and Composites06 10 00 Rough Carpentry
Millwork and finish carpentry06 Wood, Plastics and Composites06 20 00 Finish Carpentry
Insulation07 Thermal and Moisture Protection07 21 00 Thermal Insulation
Waterproofing07 Thermal and Moisture Protection07 10 00 Dampproofing and Waterproofing
Roofing07 Thermal and Moisture Protection07 50 00 Membrane Roofing
Firestopping07 Thermal and Moisture Protection07 84 00 Firestopping
Joint sealants07 Thermal and Moisture Protection07 92 00 Joint Sealants
Doors and frames08 Openings08 11 00 Metal Doors and Frames
Door hardware08 Openings08 71 00 Door Hardware
Storefront08 Openings08 41 13 Aluminum-Framed Entrances and Storefronts
Curtain wall08 Openings08 44 00 Curtain Wall and Glazed Assemblies
Windows08 Openings08 50 00 Windows
Glass and glazing08 Openings08 80 00 Glazing
Metal studs (non-structural)09 Finishes09 22 16 Non-Structural Metal Framing
Drywall09 Finishes09 29 00 Gypsum Board
Acoustical ceilings09 Finishes09 51 00 Acoustical Ceilings
Tile09 Finishes09 30 00 Tiling
Resilient flooring (LVT, vinyl)09 Finishes09 65 00 Resilient Flooring
Luxury vinyl tile (LVT)09 Finishes09 65 19 Resilient Tile Flooring
Rubber or vinyl wall base09 Finishes09 65 13 Resilient Base and Accessories
Carpet09 Finishes09 68 00 Carpeting
Painting09 Finishes09 91 00 Painting
Signage10 Specialties10 14 00 Signage
Toilet accessories and partitions10 Specialties10 28 00 Toilet, Bath and Laundry Accessories; 10 21 13 Toilet Compartments
Fireplaces and stoves10 Specialties10 30 00 Fireplaces and Stoves
Casework and cabinets12 Furnishings12 32 00 Manufactured Wood Casework
Elevators14 Conveying Equipment14 20 00 Elevators
Fire sprinklers21 Fire Suppression21 13 00 Fire-Suppression Sprinkler Systems
Plumbing22 Plumbing22 00 00 Plumbing
Mechanical (HVAC)23 HVAC23 00 00 Heating, Ventilating and Air Conditioning
Electrical26 Electrical26 00 00 Electrical
Building automation25 Integrated Automation25 00 00 Integrated Automation
Data and low voltage cabling27 Communications27 10 00 Structured Cabling
Fire alarm28 Electronic Safety and Security28 46 00 Fire Detection and Alarm
Earthwork and grading31 Earthwork31 20 00 Earth Moving
Sitework (site preparation, clearing)31 Earthwork31 10 00 Site Clearing
Asphalt paving32 Exterior Improvements32 12 16 Asphalt Paving (under 32 12 00 Flexible Paving)
Concrete curbs, sidewalks and site concrete32 Exterior Improvements32 13 00 Rigid Paving; 32 16 00 Curbs, Gutters, Sidewalks
Fencing32 Exterior Improvements32 31 00 Fences and Gates
Landscaping32 Exterior Improvements32 90 00 Planting
Water, sewer and storm33 Utilities33 00 00 Utilities
Section numbers follow the current MasterFormat edition. A project manual can use its own numbering below the division level, so check the specification's table of contents.

Older documents may still use the 16-division format from before 2004. In it, all mechanical work, including plumbing, HVAC and sprinklers, was Division 15 Mechanical, and electrical was Division 16.

We take off and price every one of these trades. The service pages, by division:

How divisions appear in an estimate

An estimate summary lists one line for each division that has work in it. On an 8,020 square foot interior renovation we estimated, twelve divisions appeared: 01, 02, 06, 08, 09, 10, 11, 12, 22, 23, 26 and 27. There was no Division 03 or 05, because an interior fit-out pours no concrete and erects no steel.

That is the first thing to check on any estimate: do the divisions listed match the trades in the drawings? A missing division usually means a missing trade. The full breakdown of that estimate is in how to read a construction estimate.

Real samples, division by division

We estimate every division, and the samples page has at least one finished estimate or takeoff for each of Divisions 01 to 12, 21 to 23, 26 to 28 and 31 to 33. A few examples:

Sample estimates by CSI division, with the building and the trade cost
DivisionSample projectFigure
02 Existing ConditionsEducation building, Maryland, 8,260 sq ft$57,620 suggested bid
03 ConcreteMulti-story building, California$846,899 concrete
05 MetalsRetail store addition, Florida, 5,155 sq ft$160,679 metals
08 OpeningsEquipment rental building, North Carolina, 10,500 sq ft$89,144
09 FinishesCity recreation center, Texas, 11,500 sq ft$86,873 flooring
22 PlumbingThree-story apartment building, Florida, 30,900 sq ft$882,592 plumbing
23 HVACFour-story hotel, Florida, 80,500 sq ft$764,512 HVAC
26 ElectricalApartment building, California, 12,200 sq ft$238,337 electrical
31 EarthworkChildcare center site, Texas$140,732
32 Exterior ImprovementsCity road and roundabout, Florida$538,980 paving
Each sample was built to that client's own specification, so wage rates, prices and markups differ from one to the next.

Common questions

MasterFormat has 50 divisions, numbered 00 to 49. Several are held in reserve for future use, so fewer than 50 are in active use. Before 2004 there were 16.

50, numbered 00 to 49, the same structure used since the 2004 edition. About 35 are in use and the rest are reserved. The answer is 50, not 16; 16 was the count before 2004.

Plumbing: domestic water piping, sanitary waste and vent, plumbing fixtures, water heaters and plumbing equipment. In the old 16-division format it was part of Division 15 Mechanical.

Fire Suppression: fire sprinkler systems, standpipes, fire pumps and clean-agent systems. Fire alarm is separate, in Division 28.

Sitework is split across three divisions: 31 Earthwork (clearing, excavation, grading, fill), 32 Exterior Improvements (paving, curbs, sidewalks, fencing, landscaping) and 33 Utilities (water, sewer, storm). In the old 16-division format it was all Division 2.

Section 32 12 16 Asphalt Paving, under 32 12 00 Flexible Paving, in Division 32 Exterior Improvements.

Luxury vinyl tile is usually specified under 09 65 19 Resilient Tile Flooring, in Division 09 Finishes. Resilient base is 09 65 13.

Division 10 Specialties, section 10 30 00 Fireplaces and Stoves. Masonry fireplaces built in place can also appear in Division 04.

Division 08 Openings, section 08 41 13 Aluminum-Framed Entrances and Storefronts. Curtain wall is 08 44 00.

General Requirements: costs that belong to the project but not to one trade, such as supervision, temporary facilities, permits, cleaning and closeout.

Division 09, Finishes, under section 09 29 00 Gypsum Board. Division 09 also covers ceilings, flooring, tile, paint and wall coverings.

In current MasterFormat, mechanical work is split across three divisions: HVAC is Division 23, plumbing is Division 22 and fire suppression is Division 21. In the 16-division format used before 2004, all of it was Division 15 Mechanical.

Division 23. Plumbing is Division 22, fire suppression is Division 21 and electrical is Division 26.

Demolition is Division 02, Existing Conditions, under section 02 41 00 Demolition. Selective interior demolition is usually 02 41 19.

The Construction Specifications Institute (CSI), together with Construction Specifications Canada. Most prescriptive specifications in the United States and Canada are organized with it.

Division 31 Earthwork, Division 32 Exterior Improvements and Division 33 Utilities. Demolition of existing structures is in Division 02.

Yes. Every estimate is organized by MasterFormat division, with a summary line for each division and a detail sheet behind it, unless you ask for your own format.

Sources

Send your plans, get an exact price