Services / CPM Scheduling
CPM scheduling services
Critical Path Method scheduling with Primavera P6 to keep projects on time and on budget.
Overview
Schedules that hold up in the field
A good estimate deserves a schedule that matches it. Our CPM scheduling services use the Critical Path Method and Primavera P6 to build realistic, resource-loaded schedules that keep construction projects on track from mobilization through closeout.
We develop clear activity sequences, identify the critical path, and highlight the milestones and constraints that actually drive your timeline. Whether you need a baseline schedule for a bid, an update mid-project, or timeline planning alongside your estimate, our scheduling keeps teams aligned and projects moving.
Ready to bid?
Send your plans, get a fixed quote in ~20 minutes.
Email drawings and scope to our estimators. No obligation, and revisions are free through bid day.
Request an EstimateCall (813) 921-2306Scope
Scheduling services

Realistic critical-path schedules
We build activity sequences and identify the critical path so your team knows exactly which tasks drive the finish date — and where the float actually is.

Primavera P6 expertise
Schedules are developed in Primavera P6 to industry standards, ready for owner submission, bid requirements, or day-to-day project control.

Estimating and scheduling together
Because we produce both your estimate and your schedule, cost and time stay aligned — resource-loaded schedules that reflect the same scope your estimate is built on.
What you receive
Every estimate package includes
Questions
Common questions
Critical Path Method scheduling maps out project activities, their logic, and durations to identify the sequence of tasks that determines the project's finish date.
Send us your plans today
Fixed-fee quote in ~20 minutes. Complete estimate in 24 to 48 hours. Free revisions through bid day.
Get Started